The Centre includes three state-of-the-art visualisation theatres and a number of studios, each with high powered computer equipment for the visual simulation of computer gaming and virtual reality products. There are also fully managed facilities including offices and a conference room.
Our remit was to advise the architect design team and develop an acoustic design that maximised both sound insulation and reverberation control.
Achieving optimum visual and audio performance levels
Minimising disturbance between rooms
Sound insulation between spaces and controlling reverberation within rooms was critical in order for the virtual simulations to be realistic. Each of the visual studios needed to be isolated from one another and work independently.
Our acoustic design plan therefore: